Management, Technology & Production (MTP) and Production Support (PS) FY10 Program Review and FYNSP Planning Meeting November 17-18, 2010; Enabling the Nuclear Security Enterprise to meet weapon production requirements
Washington DC: National Nuclear Security Administration, Defense Programs, 2010. Presumed First Edition, First printing --number of copies assembled is unknown. Three Ring Binder. The Table of Contents is: MTP (32 vugraphs, 4 per page) , PS 59 vugraphs, 4 per page), KCP (20 vugraphs, 1 per page), PX (55 vugraphs--various paginations--1 per page), SRS (41 vugraphs--various paginations--1 per page), Y12 (41 vugraphs--various paginations--1 per page), LANL (38 vugraphs--various paginations--1 per page), LLNL (48 vugraphs--various paginations--1 per page), SNL (158 vugraphs--various paginations--1 per page), Agenda (3 pages), and Participant list (1 page). In the back pocket is a November 2010 Updated to the NDAA of FY 2010 Section 1251 Report and a stapled seven sheet compilation of Budget Requirements. Some material was marked Official Use Only but this limitation is understood to not longer apply due to the passage of time and public dissemination of comparable information. Approximately 2 inches of material in the binder. The Production Support Program is a DSW Program that funds multi-system, manufacturing-based activities that provide individual site production capabilities and capacity for the LEPs, LLC production, weapon surveillance, and weapon assembly and disassembly operations. The Production Support Program also enables the modernization of production capabilities to improve efficiency and ensure that manufacturing operations meet future requirements. This includes maintenance/calibration services for manufacturing operations to meet DoD War Reserve requirements. Collectively, these activities directly support execution of systems engineering concepts and production integration. The Production Support Program provides DSW with the capability to conduct life extension work, stockpile surveillance, dismantlement work, neutron generator production, and detonator cable assembly production. The Management, Technology, and Production (MTP) Program’s work scope is a multi-system, production-based program that promotes nuclear security enterprise integration and enhances efficiency. MTP activities provide the products, components, and/or services for multi-weapon system surveillance (laboratory/flight test data collection and analysis); weapons reliability reporting to DoD; DSW requirements tracking and execution; management and operation; and stockpile planning. The MTP Program funds plant and laboratory personnel to sustain the stockpile through activities related to surveillance; weapons response process improvements; engineering authorizations; safety assessments; use control technologies; containers; base spares; studies and assessments for nuclear operation safety; production of weapon components for use in multiple weapons systems; and transportation/handling gear for use in multiple weapons systems. The MTP Program also includes activities that benefit the nuclear security enterprise mission, as differentiated from Production Support activities, which support internal site-specific production missions. Condition: Very good.
Keywords: Nuclear Weapons, Production Support, Manufacturing, Weapon Surveillance, Weapon Assembly, Weapon Disassembly, Production Modernization, Stockpile Stewardship, Weapon Response, Safety Assessments, Detonator Cable, Neutron Generator
[Book #80986]
Price: $250.00